Jump to content

Service Void battening on blockwork wall


Recommended Posts

Amongst this weekends tasks I intend on battening out a block wall for a recessed consumer unit and some service routing. 

 

Should I frame the wall, like a stud wall with horizontal header and footer, or is it simply ok to install verticals every 400 top to bottom? 

Also, is it worth insulating the voids, whilst avoiding the cable drops to the CU?  Construction is brick and block with a full filled cavity.  Should I add strips of dpm to the backs of the timber and should I paint the blockwork with airtight paint (got some soudatight left over)?

 

Thanks

Marek

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...