jpadie Posted September 21, 2023 Share Posted September 21, 2023 hi all I'm thinking of allowing for a shower room and loo in a garden room project I'm in the middle of. the loo will be in the second bay from the bottom left. the waste will exit just behind the bottom left foundation block below the floor joists. that's a good position for the soil stack and easy access to existing pipe work to the main waste. the insulation goes between the joists here. I've currently left this bay uninsulated as I am unsure how to frame the area to receive the waste pipe and stop it physically dropping in the void below. is there any standard practice here? thanks in advance! Link to comment Share on other sites More sharing options...
jpadie Posted September 22, 2023 Author Share Posted September 22, 2023 please ignore. i've had to move on and used some plastic brackets to support with no extra framing. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now