martin55 Posted August 31, 2023 Share Posted August 31, 2023 Hi, I'm seeking a very rough, ball-park figure to how much this would cost. The current drive is 5.5m x 3.6m, and it has a slope on the length (5.5m) of 80cm/0.8m. I plan to reduce this by half, so around 40cm instead. I would need a concrete block retaining wall around the perimeter, cut the top off the hollow concrete blocks to make a slope, then shutter around the top of the blocks, fill in with aggregate then fill in with concrete as the top layer. I have attached mockup. https://prnt.sc/nRtP4jHNSLdk Thanks. Link to comment Share on other sites More sharing options...
Canski Posted September 1, 2023 Share Posted September 1, 2023 How do you get on to the drive ? Link to comment Share on other sites More sharing options...
martin55 Posted September 1, 2023 Author Share Posted September 1, 2023 4 hours ago, Canski said: How do you get on to the drive ? there's an existing drop curb and that's beside the road. The mockup shows a small 20cm step. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now