Jump to content

1930s semi refurb


adrianpettitt

Recommended Posts

Hi,

 

My first post here. I'm looking forward to getting some top advice.

 

I am renovating our 1930s semi, making the existing ground floor kitchen, dining room and lounge, into an open plan space. I have already got stuck in and removed a wall and installed a wind post, specified by the structural engineer. Building control inspected that on Friday - all ok!

 

The kitchen floor is concrete, whilst the rest of the ground floor is wooden. Having taken up the quarry tiles I have found the subbase is very poor, very uneven and has no insulation, as you'd expect. So I am going to break is all out. BC have stated that I need;

 

150mm Hard core

50mm Sand

DPM

100mm Celotex PIR

100mm Concrete slab

65mm Screen

 

There will also be a Celotex insulation upstand around the external walls. I am also internally insulating the external walls as they have no cavity. So, to my first question: How thick should the PIR upstand be? As thick as the PIR on the walls?

 

Second bit of advice I'd like is on getting the new floor level! I've never done this before, so is a little daunting on how I mark the levels work off.

 

Thirdly, the Hardcore base has to be compacted, so which type of whacker plate do I hire? And does the blinding sand layer have to be compacted with one too? Is it the type used for doing patios or the type you see used at road works?

 

Enough questions for now.

Thanks in advance.

Adrian

 

Edited by adrianpettitt
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...