Screed was laid on Monday, quick drying stuff so should be good for floor coverings within 2.5-3 weeks (we'll wait 4). Advised walkable in 48 hours, full site traffic 5-7 days but don't lay stacks of plasterboard on it until it's dried out. I need to build a few stud walls on it - how long should I wait to do this? 