Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Electrical Charge Point for a new build

Featured Replies

Hi 

 

I am at the end of a build, and it looks like the electrical charge point has not been installed yet.

 

I have two parking spaces, by law, am I required to have one?

 

Is the lack of one going to put off new buyers? 

 

Any advice appreciated 

I think the requirement for houses to have charging points was introduced in June 2022. Thats when Approved Document S was introduced. So if the Building Control Application for your house was submitted before June 22 then you may not need one to meet the building regulations. If after June 22 then I think you do.

 

However if the specification/contract for your house says it includes a charging point then I would expect one to be provided regardless. 

 

 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.