jayc89 Posted February 27, 2023 Share Posted February 27, 2023 (edited) I'm about to order the bits needed for our Utility and W/C plumbing. Does my plan sound right to you? Water Supply; - Existing 22mm HEP (hot and cold) running in ceiling for bath in bathroom above. - 15mm tee into for washing machine - 15mm tee into for toilet - 10mm tee into for basin I've heard that the washing machine and toilet should be plumbed in before the multibloc valve, is that correct? Doing so would be more of a faff (or not as easy as just teeing into HEP) Waste; - new 110mm stack for toilet - 40mm Y-shaped drain for washing machine + tumble dryer drain, with trap, feeding into new 110mm stack - 32mm condensate pipe from MVHR feeding into washing machine 40mm, before the existing trap, that goes into 110mm stack - 32mm drain for W/C basin, with trap, feeding into new 110mm stack Edited February 27, 2023 by jayc89 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now