jayc89 Posted February 27, 2023 Posted February 27, 2023 (edited) I'm about to order the bits needed for our Utility and W/C plumbing. Does my plan sound right to you? Water Supply; - Existing 22mm HEP (hot and cold) running in ceiling for bath in bathroom above. - 15mm tee into for washing machine - 15mm tee into for toilet - 10mm tee into for basin I've heard that the washing machine and toilet should be plumbed in before the multibloc valve, is that correct? Doing so would be more of a faff (or not as easy as just teeing into HEP) Waste; - new 110mm stack for toilet - 40mm Y-shaped drain for washing machine + tumble dryer drain, with trap, feeding into new 110mm stack - 32mm condensate pipe from MVHR feeding into washing machine 40mm, before the existing trap, that goes into 110mm stack - 32mm drain for W/C basin, with trap, feeding into new 110mm stack Edited February 27, 2023 by jayc89
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now