sharpener Posted March 10, 2023 Share Posted March 10, 2023 29 minutes ago, lakelandfolk said: I installed a direct UVC and Solar I Boost about 9 months ago and it is working really well and I would like to keep it but Octopus say it must come out. I thought an ASHP installation could be designed to operate CH only? It's certainly possible from a technical point of view: https://forum.buildhub.org.uk/applications/core/interface/file/attachment.php?id=65234&key=5d7663389b8b5875bb42a43c57211f9d but I do not know if it is either a matter of Octopus policy or an MCS requirement to fit a new HW system. Quite typical overengineering IMHO, I bet the cost is additional to their "standard" installation for £3k. I have asked for an Octopus quotation but they do not have installers in my area yet and I fully expect to end up doing it myself. Link to comment Share on other sites More sharing options...
Bramco Posted March 10, 2023 Share Posted March 10, 2023 54 minutes ago, lakelandfolk said: I thought an ASHP installation could be designed to operate CH only? Surely, they can simply set the ASHP to Heating only? Although, I guess they have trained their teams to do an 'install' which would always include the plumbing to the DHW tank coil. Simon Link to comment Share on other sites More sharing options...
sharpener Posted March 10, 2023 Share Posted March 10, 2023 Maybe Octopus have been following this thread and want to encourage the OP to use his PV to run the HP and then export his surplus. But at least he should be given the choice, it is not very eco-friendly to scrap off new kit that is working satisfactorily. AIUI they are not offering to plumb into his existing coil, it may not be big enough or may not even exist, it is described as a "direct" UV tank. Link to comment Share on other sites More sharing options...
ReedRichards Posted March 10, 2023 Share Posted March 10, 2023 1 hour ago, lakelandfolk said: I installed a direct UVC and Solar I Boost about 9 months ago and it is working really well and I would like to keep it but Octopus say it must come out. I Do you have room for a second cylinder in series with the one you already have? The one cylinder would act to "warm up" the cold feed for the second cylinder. I don't see that Octopus could object to that and that way you could keep what you've got. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now