scottishjohn Posted November 13, 2018 Share Posted November 13, 2018 the way we built our big workshop 30x24m 30years ago was to make footings just for the pillars ,then drop in frame level it up and fill around rsj,s with concrete. the main workshop floor was then done seprate - 10" thick on 2ft of well packed hardcore.still here and no subsidance 30 years later . strip founds between posts for block work .but if hanging panels on frame to gorund level --you won,t need much as a strip between posts But modern monews i,ve seen are done as raft with bolts to fasten frame now -could be change in regs ? i remember the steel constructors trying change our minds about hot dip galv on frames --glad we did it -never had to paint it and still looks like new Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now