tvrulesme Posted May 2, 2022 Share Posted May 2, 2022 Planning drainage for a new bathroom. Assuming that all the falls/gradients are correct is there anything wrong with this plan? Soil pipe from toilet goes through wall below the floor level so that I can connect a shower waste (wetroom so flush with floor). On the other side of the exterior wall is the soil pipe vent (with rodding access) and an inspection chamber where it joins the underground drain pipe at a 90 degree angle. Been through all the regulations I can find and seems ok but maybe I am missing something? Does the shower trap adequately stop the stench from the WC waste or is there a key component I'm issing? Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now