nod Posted February 13, 2022 Share Posted February 13, 2022 With our start date looming closer Something I’ve put off for a while Mainly due to constant material rises Even muck away was up and thankfully down now Most things seam to of either stabilized or are heading down Even Pasquils quote of six months ago has dropped by 15% In any case I can base coatings on here and now We finished our previous build three years ago So the spreadsheet for that was a good place to start and a way of not missing what seamed like small items Off the new spreadsheet Previous build came in at £815m2 Two story Traditional build Two detached garages Very good quality of finishing Ive noticed this morning That I never included the m2 of the two detached garages Just added the cost into the overall build cost So the 815 was probably lower But I will still split m2 of the house and garage - Workshop As overall is 416m The actual house is 308.21 I feel quite confident that our budget of 350k should be ok The ground is a lot better now We had a tank and three 4 meter holes to fill Two with concrete and thankfully the the third with hardcore I Once I get the foundations in I should be able to cost most things accurately Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now