Gaz81 Posted November 8, 2021 Share Posted November 8, 2021 What subfloor should I be putting in below wet ufh. It's an old property (tile over soil at the moment. Am I close in thinking to excavate 225 below FF then lay 75mm compacted type 1, sand blinding, 1200g DPM, 100mm PIR, 500g DPM and 50mm flowing screed over clipped pipework with a perimeter expansion strip. Cheers, Gaz. Link to comment Share on other sites More sharing options...
Temp Posted November 8, 2021 Share Posted November 8, 2021 That sounds fine to me although I think 50mm screed might be a bit thin. Think 65mm is more standard. However i have heard some BCO insist on hardcore, concrete, insulation, screed. Compact the ground before laying hardcore. Perhaps Compact the hardcore in two layers? Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now