Jump to content

Subfloor required below wet ufh.


Gaz81

Recommended Posts

What subfloor should I be putting in below wet ufh. It's an old property (tile over soil at the moment. Am I close in thinking to excavate 225 below FF then lay 75mm compacted type 1, sand blinding, 1200g DPM, 100mm PIR, 500g DPM and 50mm flowing screed over clipped pipework with a perimeter expansion strip. 

 

Cheers, Gaz. 

Link to comment
Share on other sites

That sounds fine to me although I think 50mm screed might be a bit thin. Think 65mm is more standard. However i have heard some BCO insist on hardcore, concrete, insulation, screed. 

 

Compact the ground before laying hardcore. Perhaps Compact the hardcore in two layers?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...