Suffolk_J Posted October 15, 2021 Share Posted October 15, 2021 Hi, Apologies that this is probably a very basic question, at least I hope it is. Please see my rough drainage plan ahead of beam and block attached, would appreciate any suggestions/feedback. I think I may be able to lose one of the inspection chambers with either a sweeping bend or by coming out further to allow a straight run. My main query is that the two soil pipes entering the inspection chambers in line will exit the build at the same height, I need the fall between the 2 inspection chambers to be around 130mm to maintain 1:40. Is the correct/best way to do this to increase the drop just prior to entering the inspection chamber using a 45 degree angle? I'm trying to visualise this and just want to think ahead before putting soil pipe in place under b&b. Thanks! Link to comment Share on other sites More sharing options...
Dave Jones Posted October 16, 2021 Share Posted October 16, 2021 as long as you have a min of 12/13mm /M fall then just make both runs work to the final manhole. May need to drop one a little more or move the chamber closer etc. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now