Suffolk_J Posted October 15, 2021 Posted October 15, 2021 Hi, Apologies that this is probably a very basic question, at least I hope it is. Please see my rough drainage plan ahead of beam and block attached, would appreciate any suggestions/feedback. I think I may be able to lose one of the inspection chambers with either a sweeping bend or by coming out further to allow a straight run. My main query is that the two soil pipes entering the inspection chambers in line will exit the build at the same height, I need the fall between the 2 inspection chambers to be around 130mm to maintain 1:40. Is the correct/best way to do this to increase the drop just prior to entering the inspection chamber using a 45 degree angle? I'm trying to visualise this and just want to think ahead before putting soil pipe in place under b&b. Thanks!
Dave Jones Posted October 16, 2021 Posted October 16, 2021 as long as you have a min of 12/13mm /M fall then just make both runs work to the final manhole. May need to drop one a little more or move the chamber closer etc.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now