EPS bead damp course / foundation question


Scoobyrex

Recommended Posts

House will be block inner leaf, facing brick, 100mm cavity.

Plan is to have blown eps beads.

Do i need to install something for the eps beads to sit on at the damp course to stop the beads filling all the way down to the foundation.  One EPS installer said to create a bridge of damp course, this seems dumb, where does the water go !!!  Is there a mesh product that should be installed, or do you just let the beds fill all the way down the cavity ?