Moggaman Posted April 24, 2021 Share Posted April 24, 2021 Hi. I am pouring a concrete sub floor next week. The internal rising walls are left down 125mm internally to ease radon installation. engineer has given me 2 options ... 1. Don’t get the blocklayer back to lay a block on the radon before pouring, therefore pouring the floor straight over the internal walls.. blocklayer will then blocklayer house from this floor up. Blocks below floor are on flat and above subfloor will be on edge so blocklayer has a few mm to play with when setting out the blocks after pouring. 2. Get blocklayer back to lay a course before sub floor pour. This means continuous blocks from footing to hollowcore footing . I presume option one will mean that a partial amount of wall load and hollowcore load will be transferred to the floor. thanks Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now