I'm building a conventional warm roof which is grp on 18mm osb3 on 200mm pir on vapour control layer on 18mm osb3 on firrings on I-joists on plasterboard.  I can't see how you can get the vcl down from the lower osb3 deck to the walls to provide continuity of the vcl with the vcl in the walls.  Seems impossible.  How have others achieved this?  On a previous project I put the vcl under the lower osb3 deck and then with a bit of effort I trimmed the vcl in the walls up between every joist and taped it to the roof vcl.  However the building inspector this time is clear that he wants the roof vcl above the lower osb3 deck.  Any ideas or experiences to offer with this?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...