Harveys dad Posted January 11, 2021 Share Posted January 11, 2021 I need the benefit of your experience please . I’m in the middle of building a 105sq metre extension and looking at UFH possibilities. I had to leave the job as my wife was ill and It looks like my mate may have dropped a clanger in construction of the slab . From the bottom up we have a min 150 mm compacted dolomite , visqueen then 120mm Celotex ,reinforcing mesh on that then 150 mm concrete. I have approx 70mm to FFL . My question is with what I have would an overlay system something like egg crates with say 40mm of liquid screed work , or should I have more insulation on top of the slab .? Or is there a better method / system , thanks in advance. Link to comment Share on other sites More sharing options...
JFDIY Posted January 11, 2021 Share Posted January 11, 2021 You have enough insulation under the slab, so I'd consider bonding clip track strips to the slab that will hold the pipes, then piping it up and covering with liquid screed. You may want to talk to screed manufacturers, because I think you'd want cement based so the screed and slab have similar expansion rates to avoid cracking of the screed. Or as you say the egg box type trays, if you use these with a separate DPM this will give a slip layer to prevent differential expansion being an issue Link to comment Share on other sites More sharing options...
Harveys dad Posted January 13, 2021 Author Share Posted January 13, 2021 Thanks for your help Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now