September 5, 20206 yr Hey everyone, For new builds, did you always bring in an M&E engineer or did you just bring in a trade and talk them through what you want them to install? - I am building a 5 bed detached house around 500sqm. - I have previously managed all of this myself for a 400sqm conversion, but never done a ground up development and wondered if I should just bring in someone else to do this for me Thanks Chris
September 5, 20206 yr M & E engineer can be expensive and often better to get design and install for each element. MVHR / ventilation people can do their designs fairly cheaply. Bathroom designer will inform on that. Architect will normally suggest SVPs. You may need a drawing showing switches, sockets and lights, but you may be able to mark it on a plan and get the architect to add these in. M & E people are useful more for non-domestic, blocks of flats etc.
Create an account or sign in to comment