Adam2 Posted November 12, 2019 Share Posted November 12, 2019 So my engineer co has designed the slab reinforcement using bars (lots - generally H16 at 150 centres) and the builder contacted them to see if they could re-do as mesh - the engineers are talking 3K to do this and say they have specified bars as in compliance with eurocode..... Now, every image I can remember seeing of slabs has mesh so I'm a bit curious as to how standard specifying bars is. Engineer says using staggered laps reduces material... Appreciate any thoughts - may be pretty hard to see the detail on the design if I post that up but may see if I can tomorrow if that is of interest/help in advising me - ultimately choice is pay more to have a mesh design that may be cheaper on materials and quicker/cheaper to install vs stick with current plan. I'm estimating basement (7.5m x 5m) will has about 5 tons of reinforcement. Note that the basement only has a terrace on top but is lowest part of the build going down a hill (info in blog) . Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now