Iv just been estimated nearly 7k because it looks like they have got to dig to the other side of the road
the farm has got its connection right next to where they plan to dig. does anyone know a good way of "subletting" water? and also what sized pipe would I like to see on their side of the farm's meter to be able to cope with another house?
survey drawing.pdf