Search the Community
Showing results for tags 'trench specification'.
-
ENWL (our Network Operator) is coming next week to make the connection, and I thought it would be useful to go into some detail about establishing the supply connection in terms of what a self builder needs to do before fitting a Consumer Panel. I also have a couple of questions. I have already done all the paperwork necessary, and paid the fee. There have been two pre-inspections on site: but things have been a bit fraught recently, so I'm running behind schedule. I need to dig the trench this week. My principal concern is to do it once and do it right. I need to dig the trench over our land to meet up with the incoming trench from across the road. How deep should it be? ENWL used to provide a guide for making connections, but, as is often the case, large organisations don't maintain their hyperlinks, and so the hyperlink is dead. However, I found the correct one here. (accessed November 2017) Quite why such a document should be found on this type of online resource ( but not the DNO's site) baffles me. The document may well be out of date. The DNO guidance says (on footpaths or verges) that low voltage cable should be 450mm from the surface. But that crossing a road, it should be 600mm below the surface, So, I need to dig a trench 450mm deep plus 150mm (the low voltage cable diameter), but the cable across the road is 600mm below the surface (plus the diameter of their ducting) So there's a mismatch. I only need 3 meters of ducting across my land. (it's less than that from the road to our piggery - where the meter box will be)
- 9 replies
-
- electricity suppy
- trench specification
-
(and 2 more)
Tagged with: