A small in-build redesign means that part of the temporary window frame has to be taken out to enable someone to reach underneath it and take out the insulation. It is to be replaced by concrete. Simple job : two hours.
That was agreed in late June.
Here we are early July, contractors back on site, and two hours after they'd started, I noticed that they weren't taking the frames out to get at the insulation. A quiet word later and it's being done. Frames on their way back in.
If I hadn't been there, it would have cost us an arm and a leg to remediate that one.
It's taken three years to get the stage where I say TGIF. I can't say you all didn't warn me.