Hi,
I have got a date for our electric connection from Western Power Distribution (WPD) to be completed, and need to arrange for an electric meter from an electricity supplier. Hoorah. This is to a build site with no registered address either with the council or the post office.
First question is, does this need to be installed before the electric supply? Looking at pictures of meter boxes in other threads it would seem it is.
Next question, based on the couple of phone calls I've made, I need an MPAN number which can't exist without a registered address (or so I am being told), so I appear to be in a catch 22 situation. Should Western Power be able to provide me with an MPAN number?
Last questions - How quick should the electricity supplier (not WPD) be able to install the meter? Who's best?
Cheers
Stuart