Jump to content

Search the Community

Showing results for tags 'micro-inverter'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • BuildHub Guide: Information about the site : Introduce Yourself
    • About BuildHub.org.uk
    • Introduce Yourself
  • Build Design, Planning, Finance and Legal
    • Building Plots, Land & Renovation Properties
    • Design & Architecture
    • Funding, Finance & Tax
    • Insurance, Legal and Warranties
  • House Construction & Structural Issues
    • House Construction
    • Conversions & Extensions
    • Roofing & Lofts
    • Structural Works, Foundations & Demolition
    • Insulation & Ventilation
    • Landscaping & Outdoor Buildings
    • Damp & Infestation
  • Building Trades
    • Plumbing & Heating
    • Bricklaying, Plastering, Concrete, Blocks & Rendering
    • Joinery, Windows & Doors
    • Floors & Flooring
    • Electrics, Lighting & Home Security
    • Decorating & Tiling
    • Kitchens & Bathrooms
    • Building Materials
  • Environmental, Alternative & Green Building Methods
    • Designing Energy Efficient & Sustainable Homes
    • Renewable Home Energy Generation
    • Research & Information Sources
    • Environmental Building Politics
    • Boffin's Corner
  • Self Build & DIY: General
    • General Self Build & DIY Discussion
    • Housing Politics
    • Property TV Programmes
    • Tools & Equipment
  • Self Build Regional Groups
    • UK
    • Europe

Blogs

  • Salamander Cottage
  • The House At Mill Orchard
  • An Orkney Build (in ICF)
  • The House at the Bottom of the Garden
  • Hawthorn House
  • Rose Lane re-build
  • East Kent Self Build
  • Wee Hoose on the Croft
  • God is in the Details
  • Tennentslager
  • Kentish RenoExtension
  • Scooby Cottage renovation.
  • The Seasalter Sharp House
  • sussexlogs
  • Sips and stones may break my bones...
  • Our Journey North of the Border
  • Construction in Cornwall
  • The Fun Irish (House)
  • A house! A house! My kingdom for a house!
  • South Devon Self Build
  • Lucy Murray
  • Coffee Towers
  • caliwag
  • caliwag
  • Blackmore House
  • A woodland house
  • Druim nan Darach
  • Escarpment to the countryside
  • Recoveringbuilder
  • Netherwood lakes
  • Kingseat
  • Mr and Mrs Triassics New Home
  • Yaffles
  • Wedding Cake Re-build
  • Clancutt Lodge
  • Self-Build in Shropshire
  • South coast ICF build
  • 5 (2 adults, 3 dogs) go building in Dorset
  • Hillcroft
  • Self Build NE Scotland
  • Timber Portal Frame - but stick built
  • Self Building two in North Wiltshire
  • 1970s Chalet-style house renovation
  • Under the Chestnut Tree
  • The Larch House
  • Building in a woodland on the Isle of Wight
  • Back on the self-build waggon...
  • Gardening in the Lockdown
  • The BuildHub Gardening Blog
  • West Sussex Forever Home
  • Testing
  • Canalside Bungalow Renovation
  • Holywood Passive ICF Build
  • Finchampstead Passivhaus
  • Albaston self-build
  • Little Stud Barn
  • South East Cornwall Low Energy build
  • Scottish SIPS build
  • Gus Potter
  • Garden Escape
  • error
  • ASHP, MVHR, PV and EV combo
  • The Windy Roost
  • Wind! Yes I know but....
  • Big Bungalow Build!
  • A Rainfuel project
  • Making a cheap electrical energy meter
  • Rainwater Harvesting
  • Lessons from the road...
  • Dragons in the North
  • Surrey self build
  • The Old Cow Shed
  • Major extension and eco renovation in Leicestershire
  • Canski
  • Canski
  • Deep refurb and extension
  • Bog Lane Former Water Works
  • Renovation of Ellesmere Bungalow.
  • Energy
  • Hampshire self-build. Cheap, high quality and fast - we want all three
  • Da Bungalow
  • Air tightness - The cost of everything and the value of nothing.
  • Contemporary Dream

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


Location

Found 1 result

  1. My PV array(s) is(are) finally commissioned, they have been on the roof since November last year! Two reasons for the delay: Mains power required in the house (Available Feb), also final second fit electrical, no extensions! Internet required!!! The installers tried setting it up at the end of March but failed! They returned last week when I was there and basically I did the commissioning work!!! (Following the instructions). I have 37 x 280W Monocrystalline panels JAM6(K)-60-280-4BB (Chinese from the supplier) each coupled to an enphase micro-inverter. These are wired via 3-phase cable (house is 3-phase) into their own breaker board, then onto the main board via an import meter. Teh array is split up 10 panels SE and 27 SW, each array has it's own breaker and there is a noise suppressor in the box also. An enphase envoy is wired in next to the breaker box and communicates with micro-inverters via powerline and the world by my Wi-Fi (on an isolated subnet). The problem was that the envoy (brains) could not communicate with the micro-inverters so the system was not coming online. The installers commissioning the system were stumped so after about an hour I went up into the attic to help, First of all connecting the system to my Wi-Fi (not the temporary BT Hub from build), then I downloaded the installer app (iPhone), they logged me on, and following the instruction on my laptop set up the array details (all micro-inverters were serial numbered) and set it to work. Remarkably all micro-inverters were detected but only 2/3 communicating (powerline problems), by this time it was past support hours so they planned to come back the next day. In the meantime my electrician came in to do some odd jobs, I explained the issue to him and he suggested that they take a power feed directly off their breaker board (behind their noise suppressor) for the envoy rather than use the socket that is on the attic ring. When the installers returned the next day, I passed on the advice which they confirmed with the enphase support people and fitted the dedicated socket, unsurprisingly all bar one reported in and that one has since done so. My array is now up and running: It can be viewed here: https://enlighten.enphaseenergy.com/pv/public_systems/yYpm1387793/overview?preview=1 I have managed over 8kW in the current garbage weather and over 40kWh on one day! As an aside I had to have an interim EPC produced before the array was commissioned to enable full FIT rate claim, the EPC will be subsequently re-assessed (with Solar) to give a final realistic figure. It is a quirk of the system (designed for retrofit not new-build) that if you commission a system without a lodged EPC, you get a FIT rate of about 10% of the current puny rate, but you cannot include Solar in your EPC until it is commissioned, so you end up doing it twice!!
×
×
  • Create New...