Hi all, I am breaking ground on my build (Hooray!) albeit only to connect my temporary builders electricity supply ("TBS").
UKPN are laying the main up to the boundary of my property (£££ ).
Is the following quote generally OK for the extra bits that I have to arrange:
Ground mounted meter box, £600 (zero rated for VAT as supply & fit)
Excavate a short length of trench from my plot your boundary to the meter box location (perhaps 2 metres under concrete, 485mm deep), lay duct and backfill with warning tape, form concrete plinth, and fix meter housing £950 (zero rated for VAT)
Electrical work required to provide the earth and tails: awaiting a quote. How much might I expect this to be?
Any advice appreciated.
By the way, does the meter box need to be ground mounted? There is a panel fence there but not much else.