HI thanks the reply
I cant connect an SWA gland to the side of the CU. there's not enough room to physically do it.
I think ill just terminate in IP65 box on outside wall then bring tails of swa and earth from banjo in through wall in conduit to box above CU then go in behind CU is spaced off wall slightly as other cable go in behind.