Jump to content

Leahill

Members
  • Posts

    2
  • Joined

  • Last visited

Leahill's Achievements

New Member

New Member (2/5)

0

Reputation

  1. Hi All, So because of regs I wasn't planning on touching the service head part nor the meter outputs, I was going to put the new consumer RCD in (6A) and terminate the armoured cable to the 6A Fuse (more than enough for what feeds it) and then call somebody in to move the tail ends to the new 2way junction box. What I wasn't sure of is if I was allowed to actually install the new consumer unit into the cabinet and its sounds like some people have and others have gone to the expense of fitting a second cabinet which for me is a no option Thanks all for your great input. Les.
  2. Good morning. I need to feed a power source to my desking area and I have run an armoured cable from decking to the outside service head cabinet. The desking termination is going to a IP66 outdoor double socket and secured using a 20mm gland. The feed end of the armoured able goes into the outside service head cabinet were the service head and meter are located. The service head then feeds the Meter and the Meter then feeds the internal consumer unit using two separate tail ends (Blue & Brown). I've fitted a new 2 way consumer unit with RCD which the decking cable is connected to using a 6amp RCD. Rather than feed to supply to the decking consumer unit by way of the internal consumer unit I want to know if its possible (allowed) to have the Meter feed that goes to the internal consumer unit fed into a 2 x 5 way distribution block so that it then feeds both the internal consumer unit and the decking RCD consumer unit. Thanks
×
×
  • Create New...