I was waiting on 'tenderhooks' for 6 weeks before getting the go ahead to remove the trees. I was now under pressure to get the trees down and start excavating - at this stage I was optimistic that I would be able to get the foundations and walls up before winter set in!
I hired a tree surgeon to take down the Ash tree but to save costs I took responsibility for dealing with disposal - a big bonfire of all the smaller branches and greenery - I have kept the bulk of the timber for future use in a wood stove - still have to work out how to get it dry!
I decided with the help of friends to DIY this tree. We managed to take it down without any incidents but unlike the Ash tree it sat on the building plot and the stumps and roots needed to be removed. The tree surgeon offered to grind it out for £1000 and effectively said we would never get out with our digger, picks and shuffles. We decided to prove him wrong and a couple of days later we had it out ( see video). It took many more hours, periodically chipping away at it over subsequent weeks before we got it to a size we could get it out of the back garden, transported on the digger.
Digging the hole was a long job we hired a 1.5 ton digger which we got down the side of the house by agreeing with the neighbour to take down some fencing, the payback being I'd put up new fencing which they were happy about. We initially wheel barrowed the earth out to the front to be taken away on grab lorries but it was really hot and tiring. After 5 muck away trucks (estimated 80 tonnes) we hired a mini digger which worked a treat, in all I think we had 14 muck away trucks with a peak of 3 in one day!
Bay_leaf_removal.mp4
- Read more...
- 5 comments
- 1980 views