"Depends how low you need to go, bear in mind you will need 150mm above the finished ground level up to the damp course to provide adequate clearance.
So any system will be that high before you add 2.4m walls and a roof".
--Do you have any diagrams of how this would be constructed ? - residential
Ground is good and would be suitable for most foundations. Basically we are wanting to keep the build low and not install on a timber frame with plinth system.
Was really after the method of installation for an insulated raft to regs.
Hi,
Can anyone offer advice on installing a concrete raft foundation to reg's.
This would be for a timber framed single storey annex, lightweight roof.
Thanks