Hi all , not sure if this is the right place for this post but I have a potentially costly problem which I'd like a bit of advice on please.
I built 2 large sheds within PD limits but then the PA told me that PD rights had previously been withdrawn so would I please apply for retrospective PP.
I duly sent in the form but they then hit me with a CIL form because the total EXTERNAL area is more than 100m2.
I looked up the regs and they should be using internal area but that's an easy issue to sort out I guess.
The total area of the two sheds is 105M2, one is a games room for my young children and the other is divided into 3, a workshop, store and sitting area.
Question - the charge looks like about 18k in our area and this is totally ridiculous for these structures - what to do?
Regards,
Peter