I'm back again with another question.
So my concrete seating is going to a rectangle (hollow in the middle, bit like a square polo) 400mm deep 700mm wide and 3m x 3m.
So that has a volume of 2.5 cu/m.
As it is not structural can I throw in all my old blocks and broken slabs etc as i pour to make up some of the volume? Or would it end up cracking etc
Thanks