Thanks for the Welcome!
Potentially both Timberframe and ICF.
The plot is sloping, so needs a lower ground floor which dug into the hilside and partially below ground level. Working assumption at the moment is a raft foundation, tanked ICF lower ground floor then timber frame 1st/2nd floor. Definitely would be interested to hear if anyone on the forum has experience of this, given it's less common.