Jump to content

RossH

Members
  • Posts

    2
  • Joined

  • Last visited

RossH's Achievements

New Member

New Member (2/5)

0

Reputation

  1. Thanks for the responses. The external walls are being built up with ICF. The way the standard interface works, is that the hollower bears 80mm onto the concrete core of the ICF wall below. We then build up ICF walls from this level for the next wall pour. The main objective is to stop the concrete from the ICF flowing freely and uncontrolled into the cores. If there is no 'stop' there, there is nothing to prevent it. Airtightness in my understanding shouldn't be effected in reality, as either way the cores will be sealed by the external wall pour. It's more to do with managing the flow of concrete into the core.
  2. Hi all, Have found this forum helpful over the last year while completing my self build in Ireland. I am wondering if anyone has advice on the best way to seal Hollowcore ends before pouring the next lift of ICF walls. Currently weighing up a sand and cement mix vs a rockwool plug (both pushed 100mm inside the core). Curious whether there are other better suited options I haven't considered. Thanks Ross
×
×
  • Create New...