Hi mjnewton,
I have just had a template aborted as some of my base units were not level the surveyor told me the tolerance is 3mm within 3m. Does that mean if I have a 3m run I can only have 1mm out in 3 different areas or I can have upto 3mm out in multiple places over 3m? I have it re booked for couple of days time any help would be appreciated. The surveyor was subcontracted by the quartz supplier so I can’t check with him and I don’t want to raise the awareness to it with the supplier
Thank you