Hi all please can you help me, I am laying a concrete floor in outhouse 40m2 drawing show hardcore, dmp, slab, insulation then mesh then screed.
Most people seem to to hardcore, sand blind, dpm insulation another dpm and then slab, screed which I believe could suit me better.
Which I your option is better and what are the advantages off each, I will be fitted piped overflow heating on Flo max screed boards
Thanks