I’ve googled the life out of this and can’t find the info I need, I’m sure it’s out there but I can’t find it….
I have the foundation in for a 7mx5m block garden room, with 100mm cavity. It falls under permitted development so no need for PP or BC.
I am about to get the footings put it then I will fill the floor with the usual hardcore, sand, DPM, 100mm insulation, anther sheet of the DPM and then 100mm concrete. Which layer of DPM do I need to tie in with the dpc on the walls, the bottom or top layer or both ?
thanks