Hi all,
Would really appreciate your honesty and expert advice I’m not a landscaper im a gas engineer who tried to save himself few grand during hard times by laying blocks myself
Long story short as you can see in pictures I extended my block paving and decided to hire a guy with a digger who provided the sub base (road plannings you can see in the pictures) and skip etc .
He arrived with road plannings as he said the mot from quarry wasn’t great at the time during lockdown. He dug out and put in well over depth needed and it was gone over numerous times with the whacker plate
Now where I park my van or car it sinks I’ve tried to put some extra sand under 10-20 block as a test but it sinks again and some bits are pretty severe
I’ve had different opinions about running over it with a very heavy duty whacker and it may level itself out as it all slopes towards the road , some others saying lift blocks and sand and go over with actual mot whack it then re sand etc then others saying full take it all up and re do with mot type 1
Only thing is to hire someone would be 3-4K in being quoted and to do it myself would be £750 guy with digger and skip then mot then someone on day rate for at least 2 days so that’s expensive
Just really fed up with it and looking for some sound advice please
Thanks in advance