  1. If that was too happen how would you rectify this underpin ?
  2. Thanks for the replies, unfortunately the brickwork is nearly up and it’s only just dawn on me that this can be a problem, what’s the worst case scenario going forward?
  3. Hi there I’m just after some advice I’m building my own single story extension myself 3m x 4m foundations have been dug and passed by building control. When we came to concrete 3/4 of the pour was done as one but was late in the day we couldnt quite finish the pour, so about 1.5 metre section was poured the following morning and just butted up to previous pour. Is this likely to cause structural problems down the line thanks
×
×