Hi All. I'm looking for some advice on what pipework I'll need to feed 10 ensuite glamping pods. I currently have a 250m run of 32mm MDPE with a 'T' off in 25mm MDPE to each pod. Pressure won't be a problem as if I don't get enough pressure from the mains (not connected yet), I can always feed into a tank and pump from there. My concern is if this pipework infrastructure will be able to feed enough water to each pod (I'm working on the basis that each pod will be showering at the same time - worst case scenario kind of thing). I've currently got a digger on hire so was thinking of running another 32mm MDPE pipe all the way up the run, effectively making a loop of 32mm. However, I am being told that the current set up will suffice. Not sure what's best. I've looked online for a calculator but can't find anything that I can make sense of. Any advice would be very welcome. Thanks.