Trusting next door neighbour builder and ending up doing the single block wall after strip foundation was done. Just realised how naive we were until the building inspector questioned on joist span and luckily I was present. SE mentioned the joist span at 350mm, we ordered the material to do it at 300mm and the builder did at 600mm later showing some online tool calculations. Even for warm roof he was using 18mm osb board at top layer saying taping will air tight it but initially was told will do with caber-deck. Also we were paying above market price in midlands for the work done but was convinced that we will save by doing the works together.
Went back to SE and he rejected the 600mm span but okayed for single block with EWI, amended the plans. Now fighting it out to get the work to be corrected for the payments already made so far.
They were also doing the outbuilding and if we compare both works there are major differences. Cavity wall with good insulation, joists at right spans etc for their building.
Not sure how someone can sleep by doing a loss to others and making gains from it that to being a neighbour. Lot of lessons learned and hopefully we correct them without incurring major losses.
Back to market to find right professionals for the rest of the work.