After years of trying I’ve finally received planning approval (with conditions!) It’s been a long journey and, as it’s open-countryside I’m not sure I ever fully believed it might be possible and so now it’s a reality I’m feeling a bit like a rabbit in a headlight.
In hindsight I’ve probably achieved planning a bit ham-fisted in that I managed it all myself through pure determination and constant research (ADHD and hyper focus) plus I did my all own building design and drawings (I’m a graphic designer by trade)
To give a very brief overview, I inherited some agricultural land with a derelict timber frame barn, asked for a house and was refused, tried for Class R permitted Development (with associated operational development for an office) - approved, applied for a ‘live/work’ - refused, finally applied to demolish the barn and develop and new office (Class E) - Approved (with an ongoing condition that it can’t be used for residential)
The plan going forward is to develop a small ‘rural co-working space’ (essentially a business hub for rural business and hybrid workers) and then after a few years ‘when the dust settles’ ask for a change of use to residential.
With this in mind, while I feel the investment in the land is worthwhile, I have to keep in mind that this is a commercial project (not my home) and as such I have to be sensible with my budget ( sub £200,000 savings and inheritance)
My approval is for an approx 20m x 6m Timber Frame building with a ridge height of approx 4.8m. I’m currently exploring timber frame manufacturers (inc lodge type homes). I have spec’d screw pile foundations (but I figure I might be able to change this as a non-material amendment?)
The timber lodge route seems to be the most viable route in terms of budget - plinth foundations / caravan act compliant (no building regs) etc (I’m told they can be designed to meet building regs though!) but I’m concerned that this route might not carry the right warranties or certificates (or if I need them? I’m not looking to sell within 10 years and I’m hoping not to need finance)
The other route is a Timber frame manufacturer (looking at approaching Kingspan Timber Solutions / Solo Timber Frame etc) but I fear this might be outside my budget?
I’m not adverse to a bit of labour so I’m currently looking at weathertight solutions with the view of doing as much as I can and then getting in trades for the bits I can’t!
I’m also mindful that I need to consider…
Building regs
Surface Drainage / Sewer Treatment Plant
Air source heat pump
Mains water connection
Electric grid connection (or off-grid solution?)
I’m beginning to feel like I’m in a bit of a unique situation in that I don’t fit in the ‘self builder building my dream home category’ but it’s too small a project to be considered ‘a commercial build’
I’m keeping myself busy reading about building regulations, pipe gradient drops, percolation and discharge, table loadings for sewerage treatment etc etc and so any advice anybody is willing to share would be gratefully appreciated.