Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 09/06/17 in Blog Comments

  1. Well, after being told the electricity connection process was "with wayleave dept." I spoke to the guy who owns the land our connection has to come 1 metre through - he is absolutely fine about it, but confirmed last night that no one has been in touch with him! So posted this on NorthernNetworks Facebook page again last night and surprise surprise I got a call today from an apologetic lady saying she works in wayleave and only received the job last night. You really have to wonder how firms can get so bad at what they do - I mean you'd really have to go out of your way to be this bad! It takes dedication and a lot of effort. Anyway, on the plus side, I took a day off work today as I'm expecting several deliveries and by sheer chance the building inspector rang and said could he come and take a look at the roof today. So that was great timing and he's more than happy with it and commented on how good the standard of work is. We are pleased too and a nearby roof has also been done recently and even with a laymans eye you can see that our guys work is better. We are really pleased with the roof - it's done with recycled slates, and as we'd hoped, looks the part (it's in a rural Northumberland village) already as if it's been there years. Only the neatness of the lines gives away that bits new. Today I am putting the DPM and floor insulation down on the utility and downstairs bathroom floors with the intention of doing them first so we can get the washing machine etc in and have a shower and loo ASAP. The UFH kit is due to all arrive today, so hopefully we might get that down before the weekend in those rooms, though the utility room is where the manifold will live so the pipework there is a little involved so I'll need to be sure its right before I concrete it!.
    1 point
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...