Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 12/09/18 in Blog Entries

  1. Since my last blog post things have been fairly quiet. Our frame manufacturer, Lakeland Timber Frame, have confirm that our frame is in production and we have a date for erection of mid January. The crane company have visited site to check the narrow access and hairpin bent for themselves, they’ve confirmed that their smallest crane will be able to get onto site, with difficulty! Ss with a start date agree it was time to get the scaffold up. Originally I’d considered buying my own and selling it on after the build, however that option would have cost me £12,000. The alternative was to hire scaffolding and get it erected at a cost of £5,000. After a lot of careful consideration I’ve gone with a local scaffold company. Looking at the size of the scaffold and the shear amount of scaffolding required, ii think I’ve made the right choice. So far they’ve used six wagon loads of scaffolding kit and it’s taken 9 man days to errect. I recon there’s another 2 days to finish it off. The other thing I’ve had on my list of things to do, is get all the very tall Ash trees inspected. This is the sort of thing that tends to be low on my agenda as it’s not really Build related. However it’s just moved up the priority list after a loud thump at 3am yesterday morning. The tree just missed a plastic oil tank and party constructed outbuilding and the site loo, that’s it under the branches on the right. I couldn’t get far enough back to get the whole tree into shot, I recon it about 120 feet tall (long!). If it had fallen the other way it would have flatten on our residential cabin and us! I’ve got about six more of these and they are all going! The tree also took out the overhead power lines and at one stage 65 homes were without power for 6 hours whilst the cables were replaced.
    2 points
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...