Posted by DeeJunFan, 04 November 2015 · 420 views
Hi Guys,
A slow enough last 2 weeks, our block laying contractor is currently working on a major job and has been doing our footing walls over the weekends.
Digger man has been on holidays so it all worked out ok.
Our site had to be grading a fair bit towards the front of the house which left the footings around 1m deep at the front and only around 300mm at the rear. I was a bit concerned that we wouldn't be allowed to do a poured slab but eventually got the BCO out and he was more than happy, said we could go with a 4 inch slab but i prefer to go with at least 6 inches as some of the rooms are quite large, The kitchen/dining at the rear is 4.5x9.5m
This is how the site looks at the minute, next job is on to the drainage, fill, radon barrier and pour the slab. Have 2 weeks to get all ready before the block layers are back on site.
Fun times ahead
Comments
-
- You like this
- Unlike
-
- You like this
- Unlike
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now