After many decades of dreaming about building a contemporary house, we finally found a small plot in a no-through road in the middle of Hampshire. This blog hopes to capture our self build journey.
So, I’ve spent the last 4 days installing the posi joists and getting a temporary 18mm OSB platform down for the brickies who will start the upstairs blockwork next week. I was probably naive in thinking that posi joists would be dead straight. So a lot of time was spent, trying to pull them flat via strong backs and also concrete screws.
unsure about the jointing plates on the upper cord or the restraining straps as these will surely get in the way of sitting the chipboard floorin