Jump to content
  • entries
    39
  • comments
    187
  • views
    48548

About this blog

The slow crawl towards building a new home in Dublin....

Entries in this blog

Two Weeks Holidays and I only got to see 1 movie.....

I took two weeks holidays to catch up on some house building work and get some material onsite. Sometimes that worked, sometimes not!!  The Plumber has already been and performed most 1st fix items and I'm centralizing everything back to central manifolds: Should make replacing taps etc a lot easier in the future I hope!!    I was outside during the recent sunny spell and noticed my Brise Soleil doing their thing - the shadow modelling looks spot on for this time of yea
×
×
  • Create New...