blockwork and fintwork & beamblock flooring
oversite and underfloor heating & blockwork
demolition and footings & 4m deep one's
Retainingwall at the bottom of the garden starts to go up. Demolition of the house starts
clearing site 15/01 to 18/9 2014. static caravan is installed and site office is up 15/1/2015. skip for asbestos £1000. 600 ton of soil to move
400 m water pipe going in 23/4 2014 .Septic tank and land drain 18/9/2014
my self build
The old house 2011