Great_scot_selfbuild Posted 2 hours ago Posted 2 hours ago I've come across this statement: “Hep2O should not be installed in Continuously operated re-circulating systems (Secondary Hot Water Circulation / Ring main installations).” I was planning on using Hep2O pipework from the plant room to the end points, with the long hot water runs (20-30m) having a 10mm return line to enable circulation to avoid running taps, wasting water and waiting for the water to heat up. I was sure I'd come across this approach by others - is this something I should be worried about? if not, why not?
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now