Daddyzord Posted February 19 Posted February 19 Was thinking of the arrangement below to continue the dpm / radon barrier that is under the interior concrete sub floor to the outside with a view to creating as much of a barrier to water ingress as possible A forward draining 3 panel sliding door rail ( shown by osb ) sits on top. Exterior ground level is the Red line / top of conctrete block. Interior level ( Green line ) is 100mm above the exterior. I was also thinking to bond an additional small dpm upstand to extend up behind the aluminium door track internally. Having a bit of a wobble about how well bonded / stable the single row of brick will be on top of the dpc. I was thinking of using a very thin layer of adhesive to bond the dpc down to the blockwork first. Would really appreciate any input on this.!
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now