Was thinking of the arrangement below to continue the dpm / radon barrier that is under the interior concrete sub floor to the outside with a view to creating as much of a barrier to water ingress as possible 

 

A forward draining 3 panel sliding door rail  ( shown by osb ) sits on top. 
Exterior ground level is the Red line / top of conctrete block.
Interior level ( Green line ) is 100mm above the exterior.

 

I was also thinking to bond an additional small dpm upstand to extend up behind the aluminium door track internally.

 

Having a bit of a wobble about how well bonded / stable the single row of brick will be on top of the dpc. I was thinking of using a very thin layer of adhesive to bond the dpc down to the blockwork first.

 

Would really appreciate any input on this.!

PXL_20250219_105017787~2.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...