December 2, 20241 yr Has anyone evaluated the cost premium of going for the PH15 build system package versus separately procuring the PHPP modelling, detailing & engineering design, building fabric, windows and doors, external blinds if needed, MVHR system with conditioning and two air tests ? Many thanks in advance
Create an account or sign in to comment